Lake Forest, MN - CSAH 2/Broadway and I-35 Interchange
including 12th and 19th Streets and 4th, 7th, and the TH 61 intersection (7 in series)
Mark was responsible for the capacity analysis and final horizontal geometry of these high capacity complex system of roundabouts. The design hour volumes range from 2,500 to ~ 6,500 vph.



